Page Links: https://power.mizoram.gov.in/page/eoi-for-setting-up-of-grid-connected-solar-power-plant-at-various-places-in-the-state-of-mizoram-last-date-of-submission-is-extended-up-to-dt-15022023p
EOI for setting up of Grid-connected Solar Power Plant at various places in the State of Mizoram last date of submission is extended up to Dt. 15.02.2023
Department Updates Title
- Approval for planned shutdown of 33kV line from Chawnhu to Meisatla on Dt.13.7.2024 (Saturday)
- Approval for planned shutdown 33kV Line Melriat to Aibawk 16.07.2024 (Tuesday)
- Simplification of Connection Charges (Mizoram)
- Publication of Public Notice about Tariff summary for the FY 2024-25.
- Approval for planned shutdown of Power Network of 33kV Tlangnuam SubÂ-Station on 8th June, 2024.
Government of Mizoram Latest News