Attachment
Page Links: https://power.mizoram.gov.in/page/nit-for-selection-of-developers-for-design-manufacture-testing-supply-installation-commissioning-of-500-kwp-grid-connected-rooftop-spv-power-plants-including-five-years-comprehensive-maintenance-contract-cmcp
NIT for Selection of Developers for Design, Manufacture, Testing, Supply, Installation & Commissioning of 500 kWp Grid connected Rooftop SPV Power Plants Including Five years Comprehensive Maintenance Contract (CMC)
Department Updates Title
- Online meet link for Technical bid opening of Household Electrification Tender Friday, December 13 · 2:00 – 5:00pm
- Syllabus for direct recruitment to Junior Engineer under Power & Electricity Department
- Approval for Planned Shutdown of Power Network of 11kV Lungleng feeder on 10.12.2024
- Approval for Planned Shutdown of Power Network of 11kV ZMC feeder on 14.12.2024
- Approval for planned shutdown of 132kV line, Bukpui to Thenlum (Charged at 33kV level)